Skip to Navigation Skip to Content

Eastham Water System, Phase 2

Project Applicant: Town of Eastham 
Project Location: Townwide 
Project Description: Phase 2 of the Eastham town-wide water system will supplement the Phase 1 water system with one additional wellfield and water storage tank at town-owned property identified as “District H” (located east of the intersection of Nauset Road and Schoolhouse Road), and approximately 82 miles of water distribution piping. The distribution system includes transmission mains located throughout the town that will connect to the mains constructed during Phase 1, which were sized to accommodate a town-wide system.  

Physical project files are available for review at the Cape Cod Commission Office Monday-Friday from 8 a.m. to 4:30 p.m. Contact the Front Desk for more information, 508-362-3828.

Project Resources

View All Resources

7M pdf
May 07, 2018
2017-04-14-Eastham Water Phase 2-MEPA Certificate on Notice of Project Change
15273%202nd%20NPCTown%20of%20Eastham%20Water%20System.pdf 15273%202nd%20NPCTown%20of%20Eastham%20Water%20System.pdf…
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon