Project Description: Phase 2 of the Eastham town-wide water system will supplement the Phase 1 water system with one additional wellfield and water storage tank at town-owned property identified as “District H” (located east of the intersection of Nauset Road and Schoolhouse Road), and approximately 82 miles of water distribution piping. The distribution system includes transmission mains located throughout the town that will connect to the mains constructed during Phase 1, which were sized to accommodate a town-wide system.  

Physical project files are available for review at the Cape Cod Commission Office Monday-Friday from 8 a.m. to 4:30 p.m. Contact the Front Desk for more information, 508-362-3828.

Project Resources

View All Resources

397K pdf
Jul 13, 2018
2018-07-12-Eastham Water Phase 2-DRI Decision
3225 MAIN STREET … 1900 CROWN COLONY DRIVE, SUITE 402, QUINCY, MA 02169 PROJECT APPLICANT: PROJECT LOCATION: DATE: JULY 12, 2018 SUMMARY TOWN OF EASTHAM C/O …
4M pdf
May 07, 2018
2018-04-27-Eastham Water Phase 2-MEPA Certificate on Final SEIR
dept/commission/team/Website_Resources/ProjectFiles/EasthamWater/2018-04-27-Eastham Water Phase 2-MEPA Certificate on Final SEIR.pdf … {3C589D62-0DDC-4A7E-B081-B02E222A6F25},6
28M pdf
Apr 05, 2018
2013-04-18-Eastham Water Phase 2-District H WS 19 Pump Test Report
4-13 4.5.1 Zone B and Zone C WellsTable 4-3 TPW-3B Pump Test: Summary of Manual Water Level Measurements and Flow Rates Table 4-4 TPW-2C Pump Test: Summary of Manual Water …