Skip to Navigation Skip to Content
Start Date: 2022
  • Martha’s Vineyard Reliability Project Route MapsProject:  Martha’s Vineyard Reliability Project (CCC File No: 22009) 
  • Project ApplicantsNSTAR Electric Company d/b/a Eversource 
  • Project Location: Town of Falmouth 
  • Project Description: The Project proposes lay a fifth submarine distribution cable from Falmouth to Oak Bluffs to increase the reliability of electrical service on Martha’s Vineyard. The Project includes an approximately 2.7-mile underground duct and manhole system to house the onshore 25kV distribution cable from the existing Eversource Substation off Stephens Lane in Falmouth to the landfall site at Surf Drive Beach in Falmouth.  

Project Resources

View All Resources

162M pdf
830K pdf
May 05, 2023
2023-05-05 MV Rel Proj-DRAFT Decision
Page 1 of 12 Cape Cod Commission DRI Decision– Martha’s Vineyard Reliability Project (CCC No. 22009) May 2023 CAPE COD COMMISSION DEVELOPMENT OF REGIONAL IMPACT (DRI) DECISION Date…
2M pdf
Apr 24, 2023
2022-08-29 MV Rel Proj-Route Map
Microsoft PowerPoint - Cover [Compatibility Mode] Microsoft PowerPoint - Cover [Compatibility Mode] , EVERSOURCE SUBSTATION #933 , FALMOUTH LANDFALL Figure 1 USGS Locus Map Martha's…
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon