Skip to Navigation Skip to Content
Start Date: 2014
Completion Date: 2014
  • Project: Bourne Solar Project (CCC No: 14013)
  • Project Applicant: Farland Corporation Inc.
  • Property Owner: Parallel Products Solar
  • Project Location: 53 MacArthur Boulevard, Bourne MA (Assessor Map 25 Parcel 6)
  • Project Description: The development of a 25.14-acre site with a 7.85-acre, 2-MW solar field accessed via a 10-foot-wide, 2000-foot-long gravel drive extending from MacArthur Boulevard

Project Resources

View All Resources

11M pdf
Oct 20, 2014
2014-10-16 Bourne Solar DRI Decision
3225 MAIN STREET • P.O. BOX 226 BARNSTABLE, MASSACHUSETTS 02630 (508) 362-3828 • Fax (508) 362-3136 • www.capecodcommission.org DECISION OF THE CAPE COD COMMISSION DATE: TO: FROM:
723K pdf
3M pdf
Mar 22, 2023
2023-03-13 Bourne Solar Ext Request Plans
H:\21-878\Design Drawings\21878CV CV (1) H:-878\Design Drawings878CV CV (1)
Search Circle Icon Search Icon Document Icon Video Icon PDF Icon CSV/XLS Icon